NO.63 After there is an approved labor change to a project, what should the project manager do NEXT?

 
 
 
 

NO.64 The circuit on the RIGHT is an electrical drawing of what type of speaker system?

 
 
 
 

NO.65 A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the projector be placed?

 
 
 
 

NO.66 Which section of the Ohm’s Law chart should be used to calculate values expressed in Ohms? Select the answer by clicking anywhere within the correct quadrant.

NO.67 During an initial customer visit, it is important to determine whether or not one is

 
 
 
 

NO.68 Assuming that the speakers in the picture on the LEFT are 8 Q drivers, what is the impedance of the speaker system on the left?

 
 
 
 

NO.69 Which of the following is a benefit of benchmarking in an AV project?

 
 
 
 

NO.70 What is the MAIN difference between OLED displays and LED displays?

 
 
 
 

NO.71 Which of the following is the MOST SUITABLE security method for a small portable projector?

 
 
 
 

NO.72 Which process examines methods, techniques, and principles from peer organizations?

 
 
 
 

NO.73 A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the projector be placed?

 
 
 
 

NO.74 A loud hiss is coming from the audio system. This is MOST LIKELY caused by

 
 
 
 

NO.75 A client has a laser projector that fails and appears dead after six months’ use. The documentation shows that the projector is covered by a return-to-base or back-to-bench warranty. The client can expect to:

 
 
 
 

NO.76 Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?

 
 
 
 

NO.77 When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

 
 
 
 

NO.78 The AV Project Manager is responsible for

 
 
 
 

NO.79 One way to safeguard individual pieces of equipment in a rack from theft is the use of

 
 
 
 

NO.80 A customer wants to reuse existing network cabling to extend audio and video signals in a system refresh.
What is the PRIMARY concern?

 
 
 
 

NO.81 To help end users remember key points of the training, the training documentation should include

 
 
 
 

NO.82 A cardioid subwoofer array uses delay, equalization, and

 
 
 
 

NO.83 “Shock Loads” for equipment mounts refer to

 
 
 
 

NO.84 During the initial visit with a new client, which one of the following items should always be ascertained?

 
 
 
 

AVIXA CTS – General Exam Syllabus Topics:

Topic Weight
Duty A:Creating AV Solutions 47%
Task 1:Gather Customer Information 10%
Task 2:Conduct Initial Site Survey 9%
Task 3: Evaluate Site Environment (acoustics, lighting, seating, finishing, etc.) 9%
Task 4:Develop an AV Project Scope 9%
Task 5: Design AV Solutions 10%
Domain 2:Implementing AV Solutions 27%
Task 1:Integrate AV Solutions 10%
Task 2:Operate AV Solutions 9%
Task 3:Manage AV Projects 8%
Domain 3:Servicing AV Solutions 26%
Task 1:Maintain AV Operations 8%
Task 2:Conduct Maintenance Activities 8%

 

Pass CTS Tests Engine pdf – All Free Dumps: https://www.trainingdump.com/AVIXA/CTS-practice-exam-dumps.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below