Free 1Z0-902 Exam Braindumps certification guide Q&A [Q12-Q31]

Free 1Z0-902 Exam Braindumps certification guide Q&A [Q12-Q31]

Rate this post

Free 1Z0-902 Exam Braindumps certification guide Q&A

1Z0-902 Certification Overview Latest 1Z0-902 PDF Dumps

Oracle 1z1-902 exam is a computer-based test that consists of 70 multiple-choice questions. Candidates have two hours to complete the exam and must score at least 65% to pass. 1Z0-902 exam can be taken at any Pearson VUE testing center worldwide.

Know about the Passing Score, Duration & Questions for the Oracle 1Z0-902 Exam

  • Time Duration: 90 Minutes

  • The passing score: 64%

  • Languages: English

  • Formate: Multiple Choice

  • Number of Questions: 60 Questions

 

NO.12 You are updating your Exadata X9M-2 Elastic Database Machine with 6 database servers and 12 High Capacity Storage Servers. You will be using patchmgr to apply updates across the entire machine while still maintaining database availability.
Assuming you are driving patchmgr from an external server, which statement is true about the execution phase?

 
 
 
 

NO.13 Your system administrator reports an amber, non-blinking light on one of your Exadata storage disks. You immediately execute the ‘list physicaldisk where diskType=HardDisk and status=failed DETAIL’ command on the Exadata storage system and the specified disk is indeed reported as failed. Platinum Support has not been enabled for this system. Enterprise Manager Cloud Control is monitoring the system.
What is the next step that you should perform before you do anything else?

 
 
 
 
 
 

NO.14 Which two statements are true about applying updates on Exadata systems?

 
 
 
 
 
 

NO.15 Which two quarantine types can disable Smart Scan for multiple databases that offload SQL statements to a cell on an Exadata Database Machine?

 
 
 
 
 

NO.16 You want to monitor how a large production table is accessed. Especially, you are interested to see how the access on that particular table leverages the benefits of the Exadata Platform.
Which two actions are NOT appropriate for that purpose?

 
 
 
 

NO.17 Which three statements are true about the CELLCLI command?

 
 
 
 
 

NO.18 Which two statements are true about enabling write-back flash cache?

 
 
 
 
 

NO.19 Which two Exadata security features would you configure to control which databases can access which griddisks, when multiple databases share space on your storage servers in an unpartitioned storage grid?

 
 
 
 
 

NO.20 Which of the following is NOT a requirement when validating, receiving, unpacking, and planning access route and space requirements for Exadata Database Machine?

 
 
 
 
 
 

NO.21 What is the minimum Oracle Linux version required to support RoCE and Persistent Memory?

 
 
 
 

NO.22 You are concerned about the operating temperature of the database servers in your Exadata Full Rack and want to be alerted if the server exceeds 30C.
What command should use use to generate alerts for such an event?

 
 
 
 

NO.23 You are hardening the security posture of your Exadata Database Machine. Before disabling ssh access to the storage servers, what should you do to enable REST access to the MS process?

 
 
 
 

NO.24 You have a script with several CELLCLI commands that must be executed on each cell in your Exadata full rack. The script must run on each cell simultaneously. How must you achieve this?

 
 
 
 
 

NO.25 Which two statements are true in regards to starting the Exadata Virtual Machine?

 
 
 
 
 

NO.26 Examine these commands:
1. Execute “crscti stop cluster -all” as the grid user from one database server.
2. Execute “crscti stop cluster -all” as root from one database server.
3. Power off all network switches.
4. Execute “crscti stop cluster” as root from one database server.
5. Execute “crscti stop cluster” as the grid user from one database server.
6. Power off the rack using the power switches on the PDUs.
7. Execute “shutdown -h now” on all database servers.
8. Execute “shutdown -h now” on all Exadata storage servers.
Which is the correct order or the required commands to completely power off an Exadata Database Machine in an orderly fashion?

 
 
 
 
 

NO.27 Which are three customer options for hosting the Platinum Services Advanced Support Gateway?

 
 
 
 
 

NO.28 What are two recommended configuration best practices for backup and recovery on Exadata?

 
 
 
 

NO.29 You are planning the monitoring configuration for your Exadata X9M Database Machine.
Which three components are monitored directly through the use of Exadata-specific Enterprise Manager Plug-Ins?

 
 
 
 
 
 

NO.30 Which three of the following options are available for database consolidation on Exadata?

 
 
 
 
 
 

NO.31 Which two statements are true for the Oracle Exadata Configuration Assistant (OECA)?

 
 
 
 
 

Oracle 1Z0-902: Oracle Exadata Database Machine X8M Implementation Essentials exam is designed to validate the skills and knowledge of professionals who are looking to implement Exadata Database Machine X8M. Oracle Exadata Database Machine X8M Implementation Essentials certification exam is intended to test the candidate’s ability to install, configure, and manage Exadata Database Machine X8M. Oracle Exadata Database Machine X8M Implementation Essentials certification is widely recognized in the IT industry and can help professionals advance their careers. The Exadata Database Machine X8M is a high-performance database machine designed for running Oracle Database workloads. The machine is designed to deliver extreme performance, scalability, and reliability.

 

The Best Oracle 1Z0-902 Study Guides and Dumps of 2024: https://www.trainingdump.com/Oracle/1Z0-902-practice-exam-dumps.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below