Updated PDF (New 2022) Actual AACE International AACE-PSP Exam Questions [Q17-Q41]

Updated PDF (New 2022) Actual AACE International AACE-PSP Exam Questions [Q17-Q41]

Rate this post

Updated PDF (New 2022) Actual AACE International AACE-PSP Exam Questions

Verified AACE-PSP Exam Dumps PDF [2022] Access using TrainingDump

What is the duration, language, and format of the Planning & Scheduling Professional (PSP) Exam

  • Total questions: 119
  • Passing score: 70%
  • Duration of Exam: 5 hours
  • Format: Multiple choice, compound, scenario questions + 1 memo writing assignment
  • Language of Exam: English

How to Prepare For Planning & Scheduling Professional (PSP) Exam

Preparation Guide for Planning & Scheduling Professional (PSP) Exam

Introduction

The Planning & Scheduling Professional PSP exam test is administered by AACE International, the Association for the Advancement of Cost Engineering. In 1956, during the organizational meeting of the American Association of Cost Engineering at the University of New Hampshire in Durham, New Hampshire, 59 cost estimators, and cost engineers founded AACE International (Association for the Advancement of Cost Engineering). The International Headquarters of AACE is based in Morgantown, West Virginia, USA. AACE is a specialized non-profit organization. The Board of the Council of Engineering and Technical Specialty Boards (CESB) is a member of AACE International.

AACE operates eight qualification programs at present. Both include the agreement and passing of an evaluation to adhere to a canon of ethics. Most require previous experience in the industry and may provide recertification through continuing education or reexamination. Six of these certifications are accredited by the Council of Engineering and Scientific Specialty Boards (CESB).

This exam guide is intended to aid in achieving AACE’s specialty certification with the best possible grades. It will enable you to understand the scope of the Planning & Scheduling Professional (PSP) Exam and help you to prepare for it successfully by making use of the provided PSP exam dumps. This guide includes information on the certification test target audience, recommended preparation and documentation, and a full list of exam targets, all to help you obtain a passing grade. To increase your chances of passing the test, AACE strongly recommends a mix of on-the-job experience, course attendance, and self-study, and taking the PSP practice exams. This guide contains useful references for detailed knowledge.

 

NO.17 What is a key first step in developing a critical path method schedule?

 
 
 
 

NO.18 How much Total Float does drafting the product manual have?

 
 
 
 

NO.19 What was the original planned duration for Activity A through Activity G?

 
 
 
 

NO.20 Which statement is true?

 
 
 
 

NO.21 Using the “normal” schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?

 
 
 
 

NO.22 Using the “crashed” schedule, if you start Activity 2002 on August 12, 2001, what is the finish date for Activity 2002?

 
 
 
 

NO.23 Activity 1001 started on the scheduled date but has slipped 10 days. Activity 10002 will slip 35 days. All remaining activities retain their original duration. What is the revised completion date?

 
 
 
 

NO.24 Determine the correct formula and date for the late finish for Activity 2001.

 
 
 
 

NO.25 What owner action could have mitigated the late completion of the project?

 
 
 
 

NO.26 Activity C is a

 
 
 
 

NO.27 What method would be the best way to determine the most likely as-built critical path of a project that is underway, and the schedule of which has been partially progressed?

 
 
 
 

NO.28 The amount of time that an activity can be delayed from its early start date without delaying project completion is called

 
 
 
 

NO.29 A driving relationship is _____________________.

 
 
 
 

NO.30 Which of the following project planning situations is the most frequent contributor to cost overruns?

 
 
 
 

NO.31 Theoretically construct a summary activity for activities 6001 through 6003. Identify the governing predecessor and successor activities for the hammock:

 
 
 
 

NO.32 Which of the following will always describe the critical path? The path with

 
 
 
 

NO.33 Which of the following is NOT true?

 
 
 
 

NO.34 Constraints control events or activities that __________________.

 
 
 
 

NO.35 Which letter of the alphabet best approximates the graphical shape of a project’s cumulative cost baseline, or budgeted cost of work scheduled?

 
 
 
 

NO.36 Using the “normal” schedule, and assuming you are billing on the last day of the month for previous month and for appropriate partial months, how many invoices will you have for this project?

 
 
 
 

NO.37 Project delays are best analyzed

 
 
 
 

NO.38 These are the activities on the critical path:

 
 
 
 

NO.39 Which of the following types of delay will NOT result in a time extension and additional compensation for a contractor?

 
 
 
 

NO.40 When reconstructing a CPM schedule electronically from a hardcopy, which of the following is NOT required to determine the critical path?

 
 
 
 

NO.41 Why does activity 1001 have two successor activities?

 
 
 
 

Try Best AACE-PSP Exam Questions from Training Expert TrainingDump: https://www.trainingdump.com/AACE-International/AACE-PSP-practice-exam-dumps.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below