질문 10
Which of the following BEST describes an EDGE Expert?

 
 
 
 

질문 11
Which of the following is NOT an option for insulation in materials efficiency measures?

 
 
 
 

질문 12
Which of the following describes a more efficient lamp?

 
 
 
 

질문 13
A building is located in a hot and dry climate where water availability (rainfall) is low. Which of the following measures will give the lowest water savings?

 
 
 
 

질문 14
A medium-rise building comprises retail on the first two floors with offices on succeeding floors (third to fifth). If one of the tenants on the third floor aims for EDGE certification, which building type should be used?

 
 
 
 

질문 15
Which of the following heating systems uses Coefficient of Performance (COP) as a measure of efficiency in the EDGE software?

 
 
 
 

질문 16
A building owner tells an EDGE Auditor that water-efficient faucets are in the building’s restrooms.
However, the specifications on the faucets are not provided. The Auditor should:

 
 
 
 

질문 17
For a project in a hot and dry climate with no air-conditioning system, which of the following will NOT have an impact on the occupants’ thermal comfort?

 
 
 
 

질문 18
Which of the following may NOT lead to a higher adoption of green building practices?

 
 
 
 

질문 19
Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

 
 
 
 

질문 20
Is it possible to be both the EDGE Expert and Auditor on a project?

 
 
 
 

질문 21
In a 3-star business hotel near the city center, which of the following elements of the building’s water use breakdown is/are likely to consume the most water?

 
 
 
 

질문 22
Which of the following user roles is available in the EDGE App for an EDGE project team?

 
 
 
 

질문 23
The EDGE Preliminary Certificate is issued by the EDGE:

 
 
 
 

질문 24
The Client informs an EDGE Auditor that a key member of the design team has resigned. The Client requests the Auditor to take the member’s place for the remainder of the project’s design development as it would provide the Auditor an opportunity to identify suitable green building measures, making audit tasks much simpler. What should the EDGE Auditor do?

 
 
 
 

질문 25
A potential EDGE Client is pursuing EDGE Zero Carbon certification for a museum. Which of the following statements is correct?

 
 
 
 

질문 26
An EDGE Auditor has received initial documentation from a Client which implies that measures not selected on the downloaded PDF can be claimed. What should the Auditor do?

 
 
 
 

질문 27
To claim efficiency measure Insulation for Cold Storage Envelope, which of the following documents is required as evidence at the preliminary certification stage?

 
 
 
 

질문 28
Coefficient of Performance (COP) of the electrical chiller is defined as:

 
 
 
 

질문 29
The COP of the water-cooled chiller is 6, and the cooling thermal load is 3516 W. What is the power rating of the chiller?

 
 
 
 

질문 30
Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

 
 
 
 

질문 31
In EDGE software, occupancy sensors are used for controlling:

 
 
 
 

질문 32
Water consumption savings, resulting from greywater recovery, are based on which of the following?

 
 
 
 

질문 33
For which of the following is EDGE Advanced certification available?

 
 
 
 